On a tower, a mishandled hoist line is a dropped load waiting to happen. Master capstan hoist setup, rigging, rope handling, load limits, and inspection so every lift goes up — and comes down — safely. Built for tower climbers and telecom crews who need it done right.

$100
USDOne-time payment · 2-year access
Already have an account? Log in
More courses in Telecom